Span Status Logic

Defines the default logic for assigning the appropriate status to a span

For example, if the first wire point is 'Proposed' and the second is 'Existing', what should the status of the span be? That's what this logic defines.

Please note: If you have changed the default statuses (see here) we advise you review and adjust your span status logic accordingly.

Options:

Please list every wire point status combination with its corresponding span status. We have provided an Excel spreadsheet below with the default settings, that you can use as a starting point.

Default Setting: See table below.

Status of First Wire Point
Status of Second Wire Point
Span Status
ProposedProposedProposed
ExistingExistingExisting
ModifiedModifiedModified
RemovedRemovedRemoved
By OthersBy OthersBy Others
ProposedExistingModified
ProposedModifiedModified
ProposedRemovedRemoved
ProposedBy OthersProposed
ExistingProposedModified
ExistingModifiedModified
ExistingRemovedRemoved
ExistingBy OthersExisting
ModifiedProposedModified
ModifiedExistingModified
ModifiedRemovedRemoved
ModifiedBy OthersModified
RemovedProposedRemoved
RemovedExistingRemoved
RemovedModifiedRemoved
RemovedBy OthersRemoved
By OthersProposedProposed
By OthersExistingExisting
By OthersModifiedModified
By OthersRemovedRemoved


Changing properties: If you wish to change the option of this property, your Project Settings Administrator must request a project settings change.